B2B SOURCING   ELECTRIC MOBILITY · WHOLESALEOEM feasibility coordinated with manufacturing partnersWhatsApp+86 186 3178 0947Emailmr0947@outlook.com
← All scooter models
ELECTRIC SCOOTER / WHOLESALEX7

X7 Off-road Electric ScooterAsk about OEM/ODM options

Foldable dual-drive off-road scooter with 9,000 W total output (2 × 4,500 W) and a customizable 72 V / 40 Ah lithium battery.

Vehicle Details

X7 Off-road Electric Scooter

Foldable dual-drive off-road scooter with 9,000 W total output (2 × 4,500 W) and a customizable 72 V / 40 Ah lithium battery.

Motor power
9,000 W (4,500 W × 2)
Motor type
2 brushless motors
Battery type
Lithium
Battery configuration
72 V / 40 Ah lithium (customizable on request)
Drive system
Dual drive
Wheel size
11 in high-grip off-road tires
Frame design
Foldable
Frame material
Magnesium-aluminum alloy
Braking system
Standard hydraulic brakes
Suspension
Hydraulic front / spring rear
Controller
Built-in controller, 72 V / 50 A × 2
Control type
Electronic
Charger input / output
AC 100–250 V, 50–60 Hz; DC 84 V / 2 A
Charger plug options
Japan / US / EU plug options
Country of origin
China
Gross weight per unit
60 kg

Published performance figures are configuration dependent. Confirm the applicable battery, load, terrain and test basis for each order.

Packaging & shipping

Sales unit
Single item
Package dimensions
Packaging dimensions confirmed in the order quotation
Package gross weight
60 kg
ORDER TIMING

Delivery schedule & order milestones

Lead times vary by model and configuration. Your quotation will state the start trigger and milestone dates; transport is listed separately from production.

  1. Confirm the briefAgree the model, configuration, quantity, destination and required documents.
  2. Sample, if requestedSample preparation and approval timing are quoted as separate milestones.
  3. ProductionProduction starts from the written trigger in the accepted quotation—for example, after the agreed deposit and any required specification or artwork approvals.
  4. Inspection & ex-works readinessThe order schedule states production completion, any pre-shipment inspection and the date the goods are ready for collection as separate milestones.
  5. Dispatch & transitDispatch and estimated transit are separate from production. Routing, Incoterm, customs and destination affect the transport schedule.
B2B ORDER CHECKLIST

Confirm the commercial scope before payment

The written quotation and order documents should identify the selected build, MOQ, sample terms, currency, payment milestones, Incoterm, dispatch point, inspection scope and required shipping papers.

After-sales and spare parts

Warranty coverage, exclusions, spare-part availability and technical support vary by model and manufacturing partner. Confirm the applicable terms in the quotation and sales contract before ordering.